Pre-order €49 until 9 Nov, then €59 · ships on 10 November 2026

Home / Installing MoniWatt for SOK

Installing MoniWatt for SOK

From the box to your first reading in about ten minutes.

Before you begin

1. Choose the port

SOK rack batteries have RJ45 ports for communication. Use a free RS485 port, usually on the last battery of the chain. Keep any existing link to your inverter as it is.

2. Plug in

Connect the supplied cable from that port to the box. Power the box with USB-C. The screen turns on.

Only connect to communication ports. Never touch the battery terminals or breaker with the box or its cable.

3. Wi-Fi

Join the box’s setup network from your phone, pick your Wi-Fi, set a password for the dashboard.

4. Tell it how many batteries

Open http://moniwatt.local, enter the number of packs and their addresses. Readings start within seconds.

No network at the cabin?

The screen on the box works with no Wi-Fi at all. Add a small router later and the dashboard and alerts come to life.

Something not right?

Know your SOK batteries from the house

Order MoniWatt for SOK today. Prepared and tested for your rack, dispatched on 10 November 2026.

Pre-order for €49Pre-order price · €59 from 10 Nov · ships on 10 November 2026 · free cancellation until dispatch